New House Development

Foundation
It’s beginning of the construction process. The site is clear and dig commence to prepare for the drainage and foundation. This stage covers all ground work up to the damp proof course level of the property. It encompasses the installation of all appropriate services such as drains, water, gas and mains electricity and the construction of the concrete floor

Structure

Structure refers to all the construction work which occur after the completion of the foundation and sub-structure works to damp proof course level. This stage include the construction of the walls, installation of the external doors and windows.

Services

First Fix

This is the term which refers to the stage where non load bearing walls (and staircase where applicable) are installed in the property. This stage also includes the installation of plumbing and heating as well as the wiring of the electric.

Second Fix

At this second fix stage the kitchen is installed. Also all sockets, light fittings and switches are fit to complete the electrical installation. The plumbers will also install bathroom suites and other sanitary ware together with the central heating system. Internal joinery work: doors, skirting, coving etc are also finalised at this time. All tiling to floors and walls is also completed at this stage.

Outdoor

External Works

This includes laying the driveway, footpath and patio area to the property where appropriate. It also includes landscaping of the front garden including lawn, trees, and shrubs.